A short, boring list of checks that has saved more Austin projects than any design decision we have made. The list is our judgment. Every constraint on it is code, and we link to the code.

Guidance, not code This is our read on a decision, based on building here. It is not code. Where it depends on a rule, we link to the rule.

Due diligence is the cheapest money in a build, and it is the money owners most often skip. In our experience every item below costs less than one week of a stalled project, and any one of them can — and should — end a purchase.

Our rule of thumb

We do the research ourselves. The two things we pay for are a survey and title work; everything else on this list is reading we do in house, so there is no consulting bill attached to it. That is worth asking any builder before you assume this is a line item on your side. Either way it belongs inside the lot price rather than beside it: every check here is cheaper than the constraint it finds.

What we check, and in what order

Our rule of thumb

Do the survey first and everything else after. We think it is the most load-bearing document on the list: it is the item most likely to change the answer, and the rest are cheaper to commission once you know where the real boundary is.

Our rule of thumb

Walk if two of these come back bad. One constraint is a design problem and usually solvable. Two interacting constraints — a creek setback plus a heritage tree, say — tend to leave a buildable area that no plan we would want to build fits inside.

The checklist is ours. The constraints are code.

Each report above is being read against a rule, and the rules are not ours to state. Everything below links to the page that cites the ordinance and carries a verification date. We deliberately do not repeat the thresholds, widths or percentages here — a number copied onto this page is a number nobody re-checks.

Water: floodplain, creeks and drainage

This part is code What the floodplain actually means in Austin

Why the regulatory floodplain here is not always the FEMA one, and what it prohibits.

This part is code Is this lot in the floodplain?

What has to be mapped and shown, and what happens when no map has been delineated.

This part is code Which watershed the lot is in

Austin regulates by watershed classification and by zone within the site — you need both answers.

This part is code Creek buffers: the critical water quality zone

Where development near a creek is prohibited outright, and how the buffer is measured.

This part is code Drainage and detention

What an application has to show about stormwater, and who ends up maintaining it.

The lot itself: trees and ground

This part is code Protected and heritage trees

Which trees need a permit to remove, and how narrow the criteria are.

Two more site constraints belong on this list and we are not linking them yet, because the pages that cite them have not published: steep slopes and cut-and-fill limits, and critical environmental features such as springs, sinkholes and rimrock. Ask your surveyor and your civil engineer about both. We would rather tell you a page is missing than answer from memory on this page.

What the lot lets you build

The reports tell you what the ground is. These tell you what you are allowed to put on it — which is the part that decides whether the lot is worth its price to you specifically.

This part is code Residential zoning districts compared

What each single-family district allows, side by side.

This part is code How many units the lot allows

What you may build after HOME, and what the old ADU rules became.

This part is code How much floor area you get

The cap on total floor area, and what counts toward it.

This part is code Impervious cover limits

How much of the lot may be covered by anything water cannot pass through, and what counts.

This part is code Setbacks

How far a structure has to sit from each property line.

This part is code Splitting the lot

What creating a new lot requires — a different question from building on one.

This part is code What needs a permit, and in what order

The sequence approvals come in, which is what sets your calendar.

Want a second pair of eyes on a lot before your option period runs out?

We do this research ourselves on every lot we buy, so it costs us time rather than fees — and we are happy to run it on yours. Send the address and whatever you already have. No charge and no strings, and if it is a lot we would walk away from we will tell you that too.

Send us the address

What we are not telling you

We do not quote per-report prices, review durations, or a cost per square foot anywhere on this page. We could give you numbers from our own jobs, but stated flatly they would read as researched figures, and they are not. Your surveyor and title company will each quote you in a day.

Our rule of thumb

Put the whole list under an option period long enough to actually run it, and negotiate that length harder than you negotiate the price. A short option period is how owners end up buying the lot and finding the creek buffer afterwards.

Written by KiliGray Homes from projects we have built in Austin.

KiliGray Homes AI

AI-powered — not a human
Hey! I can help you learn about our available homes or our custom building services. Are you looking for a move-in ready home, or thinking about building something custom?
Powered by Claude